[22] J. Xie, "Thirty Years of Mathematical Modeling Courses in China: A Review and Reflection", Keynote Speech at The 7th Forum on University Mathematics Courses, Changsha, China, Nov. 2011.
[21] J. Xie, "Contract Design for Supply Chain Coordination", Keynote Speech at Forum on Operations Management Courses, Chengdu, China, July 2010.
[20] J. Xie, "Reflections on ICTMA-14", Keynote Speech at The 11th National Conf. on Math. Modeling and Applications, Fuzhou, China, Aug. 2009.
[19] Z. Qian, J. Xie, "Coop advertising in a Supply Chain with Both Direct Channels and Store Brands", 10th CSIAM National Conference (CSIAM-2008), Zhengzhou, Henan, China, Aug. 2008.
[18] J. Xie, "Reflections on ICTMA-13", Keynote Speech at The 10th National Conf. on Math. Modeling and Applications, Chengdu, China, Aug. 2007.
[17] J. Xie, M. Wang, "Early Order Commitment in a Supply Chain with one Manufacturer and Multiple Retailers", 2007 Conference on Logistics and Supply Chain Management, Shanghai, China, May 2007.
[16] J. Xie, "Reflections on ICTMA-12", Keynote Speech at The 9th National Conf. on Math. Modeling and Applications, Taiyuan, China, Aug. 2005.
[15] J. Xie, "Recent Developments in Supply Chain Management", Keynote Speech at Annual Conference of Beijing Operations Research Society, Beijing, China, Dec. 2004.
[14] J. Xie, "Coordinating Supply Chain through Early Order Commitment", 8th CSIAM National Conference (CSIAM-2004), Xiangtan, Hunan, China, Aug. 2004.
[13] J. Xie and J. Dong, "Simulation Study on Information Sharing and Co-ordination in Supply Chain Management", Proceedings of the 4th China National Symposium for Young Operations Researchers and Managers (ORM'2001), Beijing, China, Oct 2001. Global-Link Publishing Company Hong Kong. pp. 191-195. (in Chinese)
[12] J. Li and J. Xie , "Performance Analysis for Distributed Distribution Systems with Time Window under Uniform Distribution of Transportation Times", The 6th National Conference of The Operations Research Society of China (ORSC'2000), Changsha, China, Oct. 10-13, 2000. Global-Link Publishing Company Hong Kong. pp.664-670. (in Chinese)
[11] J. Xie and Q. Wu , "Performance Analysis for the Capacitated Production Systems under Rolling Horizon and Demand Uncertainty", Proceedings of the 3nd National Youth Conference of Operations Research and Management (ORM'99), Beijing, China, August 1999. China Higher Education Press and Springer-Verlag. (in Chinese)
[10] X. Zhao and J. Xie, "Introduction to Supply Chain Management", Hong Kong Commercial Daily, 26 Aug 1998(Part I), 27 Aug 1998 (Part II), 02 Sep 1998 (Part III), 03 Sep. 1998 (Part IV). (in Chinese)
[9] J. Zhang, J. Xie, W. Xing and Z. Tan, "Fuzzy Analysis for the House of Quality (HoQ)", Proceedings of the 2nd National Youth Conference of Operations Research and Management (ORM'97), Zhengzhou, China, Nov., 1997, pp.345-350. (in Chinese)
[8] J. Xie and J. Zhang, "Instability of production schedules", Proceedings of the 2nd National Youth Conference of Operations Research and Management (ORM'97), Zhengzhou, China, Nov., 1997, pp.340-344. (in Chinese)
[7] J. Xie and Q. Jiang, "Genetic algorithm for lotsizing problems with overtiming", Proceedings of the 4th CSIAM National Conference (CSIAM-1996), Fudan University Press, Shanghai, China, Sep. 1996, pp.548-552. (in Chinese)
[6] J. Xie and L. Zhang, "Genetic algorithm for machine scheduling problems", Proceedings of the 3rd ORSC National Conference on Scheduling, Zhengzhou, China, April 1996. (in Chinese)
[5] J. Xie and Q. Jiang, "New Developments of mathematical models of short-term lotsizing and scheduling problems", in: Zhang Siying (ed.), Proceedings of 1995 China Conference on Control and Decision (CDC'95), China North-East University Press, Shenyang, China, May 1995, pp.758-761. (in Chinese)
[4] J. Xie, T. Wang and W. Xing, "A software package for capacitated lotsizing and scheduling problems (CLSP)", Proceedings of the 1st National Youth Conference of Operations Research and Management (ORM'94 ), China Metallurgical Industry Press, Wuhan, China, May 1994, pp.296-300. (in Chinese)
[3] J. Xie, "Polynomial algorithms for single machine scheduling problems with multiple nonrenewable resources", Proceedings of the 2nd ORSC Conference on Scheduling, Wuhan, China, April 1993, pp.1-4. (in Chinese)
[2] G. Li and J. Xie, "Bottleneck-based scheduling method of the shop floor", Proceedings of the 2nd China Conference on CIMS (CIMS-China'92), Dec. 1992, Shenzhen, China, pp.10.1-10.4. (in Chinese)
[1] G. Li and J. Xie, "Mathematical Problems in Computers Intergrated Manaufacuring Systems (CIMS)", Selected Papers on Applied Mathematics, Dept. of Applied Mathematics, Tsinghua University, 1991, pp.130-143. (in Chinese)